HDTutorial
EN

Playback starts YouTube’s embedded player (privacy-enhanced mode).

How to Install Through the Floor Sub Frame connectors on your 1979-2004 Mustang.

53,502 views February 28, 2020 18:22

Watch on YouTube
ChannelTeam Z Motorsports

Description from the creator

*Measurements*

Foxbody
Starting from the rear bulkhead behind the front seats
-Bulkhead to the center line of the fist kicker is set at 1-5/8"
-Bulkhead to the center line of the second kicker is set at 48-3/16"

SN
Starting from the rear bulkhead behind the front seats
-Bulkhead to the center line of the fist kicker is set at 2"
-Bulkhead to the center line of the second kicker is set at 48"

(These measurements are for the center line of the kicker to match the center line of the Team Z 8 point cage kit.)

Dave has set up around 1,000 ( yes we know that's not 5k :) rear suspensions for drag racers. Here he is going to share a little bit of his knowledge and experience with you.
Thanks for watching!

We love getting to share our knowledge with all of our customers from new racers to the highest level. Want to see more? Let us know what content you would like to see in the comments below.

Team Z Through the Floor Sub Frame connectors ►
teamzmotorsports.net/Through_the_floor_sub_fram…

Webstore ► teamzmotorsports.net

Follow us on social

Instagram ►instagram.com/teamzmotorsportsofficial/
Facebook ►facebook.com/TeamZmotorsports/

Watch the more Team Z content here ► youtube.com/channel/UCiodtw9CiQRanGwYZ7_ip8g

About this tutorial

Team Z Motorsports published this 18:22 video tutorial on February 28, 2020. It has been watched 53,502 times on YouTube.

Duration
18:22
Published
February 28, 2020
Views
53,502
Likes
550

Tags

Share

This tutorial in other languages