HDTutorial
EN

Playback starts YouTube’s embedded player (privacy-enhanced mode).

How to install a duct takeoff start collar-The Sheet Metal Kid

704,646 views November 4, 2014 4:18

Watch on YouTube
ChannelThe Sheet Metal Kid

Description from the creator

To install a duct start collar you need to first cut your hole in the duct and simply bend every 4th tab on the duct start collar then insert your start collar into the duct, and simply fold the remaining tabs over on the inside of the ducting.

Visit my "how to cut a round hole" video to become an expert!
youtu.be/_qvFPdBJmA8

The Sheet Metal Kid channel consists of how to's and tutorials on how to use HVAC and sheet metal hand tools as well as how to install duct and ventilation correctly. We are a highly interactive channel to help you with all your sheet metal and ducting installation.

About this tutorial

The Sheet Metal Kid published this 4:18 video tutorial on November 4, 2014. It has been watched 704,646 times on YouTube.

Duration
4:18
Published
November 4, 2014
Views
704,646
Likes
3,396

Tags

Share

This tutorial in other languages