HDTutorial
EN

Playback starts YouTube’s embedded player (privacy-enhanced mode).

How to INSTALL HuM SAFE WATER 10 UV Water Filter System

5,172 views October 29, 2015 7:32

Watch on YouTube
ChannelGary the Water Guy

Description from the creator

How to INSTALL HuM SAFE WATER 10 UV Water Filter System? Practical tips from Gary the Water Guy at Water eStore.

Need help figuring out the right fix for your water? Our team reviews well and city water issues and recommends what actually fits your home.

Talk to our team:
🇺🇸 United States: waterestore.com/pages/water-estore-customer-int…
🇨🇦 Canada: waterestore.ca/pages/water-estore-customer-inta…

Shop filters, parts, and systems:
🇺🇸 United States: waterestore.com
🇨🇦 Canada: waterestore.ca

Common problems we help with: hard water, iron staining, sulfur (rotten egg) smell, sediment, poor taste or odor, softener and reverse osmosis troubleshooting, and filter changes.

Subscribe for practical water treatment tips from Gary the Water Guy: installs, maintenance, and troubleshooting for well and city water.

#WaterTreatment #GaryTheWaterGuy #WellWater #CityWater #WaterFilters #DIYPlumbing

More in this video:

How to Install a UV Dynamics Mini Rack UV Water Filter System FREE SHIPPING CANADA and Discount Pricing available here thewaterfilterestore.com/search?type=product&am…
thewaterfilterestore.com/ or thewaterstoremidland.com
Share this video youtu.be/09R6M9BbCG0 For more great information about water treatment, subscribe! youtube.com/user/WaterStoreMidland

Follow me
facebook.com/TheWaterStoreMidland
facebook.com/TheWaterFilterEstore
twitter.com/GarytheWaterGuy
linkedin.com/in/garythewaterguy
or email at [email protected] or [email protected]
Before you start, make sure your source water meets these requirements or you will need to treat it before the UV.
Turbidity less than 1 NTU
Suspended Solids less than 10mg/L
Colour None
Total Iron less than 0.3 mg/L
Manganese less than 0.05 mg/L
Hardness less than 7 gpg
Before you start, keep these precautions in mind:
The UV disinfection system should be the last step of your water treatment system. Choose a location for installation with a nearby electrical outlet. Note the direction of water flow in the supply line, it would flow into the mini rack on the sediment filter side and out of it on the UV side. Refer to the plumbing diagram and check that you have all necessary fittings for installation. Note: A minimum of 17” clearance at lamp cord end of the chamber will allow most maintenance procedures to be accomplished without removing the Mini Rack system.
The Mini Rack system needs to be mounted where you have access to replace the UV bulb in the future and where any water being spilled during filter replacement will not splash into or onto electrical components.
Note: Do not touch the lamp or the quartz sleeve with your fingers. Handle by ends only or wear soft gloves.

1. Shut off the main water supply valve.
2. Mount the mini rack to the wall using the mounting bracket provided. You can mount it so water flows into the sediment filter inlet on either side just by turning it around.
3. Install new plumbing as per diagram in manual. WARNING: if soldering, do not allow heat near plastic threads or fittings.
4. Place the thinner “O” ring into the groove of the gland nut holder, and the thicker “O” ring on the open end of the quartz sleeve. Then push the quartz sleeve into the gland nut until the sleeve touches the top.
5. Place the quartz sleeve into the opening at the top of the UV chamber and screw it into place.
6. Place the lamp spring and the lamp into the quartz sleeve and, holding the top of the lamp, attach lamp to the lamp connector. Push the lamp connector down snugly into the gland nut and tighten the retainer screw. WARNING: do not over tighten as plastic threads are easily damaged
7. Remove the nut from the ground stud at the top of the unit. Next place the ground wire (green wire with yellow stripe) over the stud and re-install nut and tighten.
8. Open the valves on either side of the disinfection chamber. Check for leaks. Open supply valve slowly and bleed air from system.
9. Connect UV power source to AC line. UV power source audio alarm will sound three times before igniting the lamp. Your UV Dynamics disinfection system is now ready for service. Before service begins, all household plumbing lines should be chemically disinfected.

(Full walkthrough continues in the video.)

About this tutorial

Gary the Water Guy published this 7:32 video tutorial on October 29, 2015. It has been watched 5,172 times on YouTube.

Duration
7:32
Published
October 29, 2015
Views
5,172
Likes
31

Tags

Share

This tutorial in other languages