Playback starts YouTube’s embedded player (privacy-enhanced mode).
How to model pedestrian crossings in Aimsun Next
ChannelAimsunDescription from the creator
This video shows you how to include pedestrian crossings in the control plan.
We’ll look at two examples: a fixed control plan and push-button crossings.
Pedestrians are included in the demand for dynamic scenarios.
The experiment activates the Aimsun Next Pedestrian Simulator.
Pedestrian trips are coded from origin to destination.
Pedestrian crossings appear in the Signal Groups tab.
You can group them together with vehicle turns.
Or, for more flexible control plan definition, put pedestrian crossings in a separate signal group.
The control plan specifies the green activation and duration for each signal group.
Phase 1 is green for the main avenue and secondary pedestrian crossing.
Set Recall to Maximum to request green constantly with no need for a detector.
Phases 2 and 4 are clearance interphases.
Phase 3 is only called when pedestrians are in the waiting area or when vehicles are detected.
The continued presence of pedestrians or vehicles can also extend the green period.
The Simulation Control tab shows which phase is active.
In an intersection with a push-button crossing, phase 3 can be triggered by vehicles waiting in the yield turn area.
Or it can be triggered exclusively by the presence of pedestrians.
You can define a crosswalk area in a node:
draw a polygon and convert it into a crosswalk area.
You can also include crosswalk areas in a signal group.
Adjust the crosswalk waiting areas.
Now pedestrians can behave more realistically, taking the shortest path to where they want to go.
We’ll look at two examples: a fixed control plan and push-button crossings.
Pedestrians are included in the demand for dynamic scenarios.
The experiment activates the Aimsun Next Pedestrian Simulator.
Pedestrian trips are coded from origin to destination.
Pedestrian crossings appear in the Signal Groups tab.
You can group them together with vehicle turns.
Or, for more flexible control plan definition, put pedestrian crossings in a separate signal group.
The control plan specifies the green activation and duration for each signal group.
Phase 1 is green for the main avenue and secondary pedestrian crossing.
Set Recall to Maximum to request green constantly with no need for a detector.
Phases 2 and 4 are clearance interphases.
Phase 3 is only called when pedestrians are in the waiting area or when vehicles are detected.
The continued presence of pedestrians or vehicles can also extend the green period.
The Simulation Control tab shows which phase is active.
In an intersection with a push-button crossing, phase 3 can be triggered by vehicles waiting in the yield turn area.
Or it can be triggered exclusively by the presence of pedestrians.
You can define a crosswalk area in a node:
draw a polygon and convert it into a crosswalk area.
You can also include crosswalk areas in a signal group.
Adjust the crosswalk waiting areas.
Now pedestrians can behave more realistically, taking the shortest path to where they want to go.
About this tutorial
Aimsun published this 4:21 video tutorial on October 3, 2020. It has been watched 2,253 times on YouTube.
- Channel
- Aimsun
- Category
- Science & Technology
- Duration
- 4:21
- Published
- October 3, 2020
- Views
- 2,253
- Likes
- 17
Tags
Share
This tutorial in other languages
- FRComment modéliser des passages pour piétons dans AIMSUN Next
- ESCómo modelar los pasos de peatones en Aimsun Siguiente
- PTComo modelar travessias de pedestres em AIMSUN Seguinte
- ITCome modellare attraversamenti pedonali in Aimsun Successivo
- DEWie zu Fußgängerüberwegen in AIMSUN nächstes Modell
- NLHoe te voetgangersoversteekplaatsen in AIMSUN volgende model
- RUКак модель пешеходных переходов в Aimsun Далее
- PLJak modelować przejścia dla pieszych w Aimsun Następny
- JAAimsun次で横断歩道をモデル化する方法
- ARكيفية تصميم نموذج معابر المشاة في Aimsun التالي
- HIAimsun अगला में पैदल यात्री क्रॉसिंगों मॉडल करने के लिए कैसे
- IDBagaimana model penyeberangan pejalan kaki di Aimsun Berikutnya