How to Install a Basement Bathroom | Ask This Old House

4,123,693 views November 9, 2016 8:01

Watch on YouTube
ChannelThis Old House

In brief

This Old House’s Richard Trethewey guides you through roughing in the drainpipes for a basement bathroom, covering trench digging, pipe cutting, and PVC assembly. Ideal for DIYers tackling a basement renovation with concrete floors.

Key steps

  1. Lay 2x4 wall plates to mark bathroom perimeter and fixture centers.
  2. Dig a trench from the old drainpipe to new shower/toilet flange locations.
  3. Cut the old cast-iron drainpipe with a diamond wheel and attach a flexible coupling.
  4. Assemble 3-inch PVC pipes and fittings to connect old and new drains.
  5. Secure the PVC assembly to the old pipe using a hose clamp.
  6. Run 2-inch PVC pipes to shower and sink, ensuring 1/8-inch-per-foot slope.
  7. Install traps for fixtures and anchor them with steel-reinforcing bars.
  8. Cover toilet drain with a foam cap before concrete pour.

Questions & answers

What materials are needed for the drainpipe setup?

Schedule 40 PVC pipe, glue, cleaner, flexible couplings, and a styrofoam toilet drain cap (model JS13140).

Do the pipes need to be inspected before pouring concrete?

Yes, rough piping must be inspected by an authority before the concrete floor is poured.

Description from the creator

Richard Trethewey shows how to rough-in the drainpipes for a basement bathroom. (See below for steps.)

SUBSCRIBE to This Old House: bit.ly/SubscribeThisOldHouse

Richard used standard schedule 40 PVC pipe for the new drain lines. All of the supplies for this project, including PVC, glue and cleaner, and flexible couplings, are available at home centers and plumbing supply companies.

Contractor Jeremiah Kelley used a styrofoam cap to protect the toilet drain from concrete. It is manufactured by Richard Specialty [richardspecialty.com/] and available for purchase through Ferguson [ferguson.com/] (model no. JS13140).

Expert assistance with this project was provided by Service Plus of Indianapolis [serviceplusnow.com/].

Steps for How to Install a Basement Bathroom:
1. Lay out the 2x4 bottom wall plates to establish the perimeter of the bathroom walls.
2. Measure off the wall plates to locate the center of the shower drain and toilet flange.
3. Dig a trench extending from the existing drainpipe over to the new locations of the shower drain and toilet flange.
4. Use a right-angle grinder fitted with a diamond-impregnated cutting wheel to cut through the old cast-iron drainpipe.
5. Attach a flexible no-hub mechanical coupling onto the end of the just-cut drainpipe. Tighten hose clamp onto the cast-iron pipe with a torque wrench.
6. Cut and glue together 3-inch-diameter PVC pipes and fittings to form the drainpipe assembly that connects the old cast-iron pipe to the new shower and toilet drain.
7. Slip the end of the PVC drainpipe assembly into the mechanical coupling attached to the old cast-iron pipe. Tighten the hose clamp to secure the PVC pipe.
8. Next, run 2-inch-diameter PVC pipe from the drainpipe assembly over to the shower and vanity sink.
9. Install traps for each fixture, and be sure the pipes slope 1/8 inch per foot to drain properly.
10. Drive a 1/2-inch-diameter steel-reinforcing bar down into the soil beside each trap. Then, use duct tape to secure the bars to the traps.
11. Have the rough piping inspected before pouring the concrete floor.
12. Cover the open end of the toilet pipe with a foam cap. Wrap plastic around the shower-drain pipe.
13. Have the concrete contractor pour a new floor around the piping.

About Ask This Old House TV:
Homeowners have a virtual truckload of questions for us on smaller projects, and we're ready to answer. Ask This Old House solves the steady stream of home improvement problems faced by our viewers—and we make house calls! Ask This Old House features some familiar faces from This Old House, including Kevin O'Connor, general contractor Tom Silva, plumbing and heating expert Richard Trethewey, and landscape contractor Roger Cook.

Looking for more step by step guidance on how to complete projects around the house? Join This Old House INSIDER to stream over 1,000 episodes commercial-free: bit.ly/2GPiYbH

Plus, download our FREE app for full-episode streaming to your connected TV, phone or tablet:
bit.ly/34RYEP5

Follow This Old House and Ask This Old House:
Facebook: bit.ly/ThisOldHouseFB
Twitter: bit.ly/ThisOldHouseTwitter
bit.ly/AskTOHTwitter
Pinterest: bit.ly/ThisOldHousePinterest
Instagram: bit.ly/ThisOldHouseIG
bit.ly/AskTOHIG

For more on This Old House and Ask This Old House, visit us at: bit.ly/ThisOldHouseWebsite

How to Install a Basement Bathroom | Ask This Old House
youtube.com/user/thisoldhouse/

About this tutorial

This Old House published this 8:01 video tutorial on November 9, 2016. It has been watched 4,123,693 times on YouTube.