HDTutorial
EN

Playback starts YouTube’s embedded player (privacy-enhanced mode).

How to install central heating. Part 19.

18,830 views November 13, 2013 12:31

Watch on YouTube
ChannelTrevs Shed

Description from the creator

The boiler manifold connections are now complete.
A look at the Fernox TF1 and the Salamander scale preventer.
Use full bore isolation valves.
Lead-free solder, wire wool and flux remover.
LeGrand Tenby Quick earth clamps, available in two sizes.
End feed solder fittings look more professional and are really cheap.
Just the condensate pipe to drill a hole for.
We are using the Worcester Bosch Condense Sure
worcester-bosch.co.uk/installer/our-company/new…

About this tutorial

Trevs Shed published this 12:31 video tutorial on November 13, 2013. It has been watched 18,830 times on YouTube.

Channel
Trevs Shed
Duration
12:31
Published
November 13, 2013
Views
18,830
Likes
33

Tags

Share

This tutorial in other languages