Playback starts YouTube’s embedded player (privacy-enhanced mode).
How to install central heating. Part 19.
ChannelTrevs ShedDescription from the creator
The boiler manifold connections are now complete.
A look at the Fernox TF1 and the Salamander scale preventer.
Use full bore isolation valves.
Lead-free solder, wire wool and flux remover.
LeGrand Tenby Quick earth clamps, available in two sizes.
End feed solder fittings look more professional and are really cheap.
Just the condensate pipe to drill a hole for.
We are using the Worcester Bosch Condense Sure
worcester-bosch.co.uk/installer/our-company/new…
A look at the Fernox TF1 and the Salamander scale preventer.
Use full bore isolation valves.
Lead-free solder, wire wool and flux remover.
LeGrand Tenby Quick earth clamps, available in two sizes.
End feed solder fittings look more professional and are really cheap.
Just the condensate pipe to drill a hole for.
We are using the Worcester Bosch Condense Sure
worcester-bosch.co.uk/installer/our-company/new…
About this tutorial
Trevs Shed published this 12:31 video tutorial on November 13, 2013. It has been watched 18,830 times on YouTube.
- Channel
- Trevs Shed
- Category
- Howto & Style
- Duration
- 12:31
- Published
- November 13, 2013
- Views
- 18,830
- Likes
- 33
Tags
Share
This tutorial in other languages
- FRComment installer le chauffage central. Partie 19.
- ESComo instalar la calefacción central. Parte 19.
- PTComo instalar o aquecimento central. Parte 19.
- ITCome installare il riscaldamento centralizzato. Parte 19.
- DEWie Zentralheizung zu installieren. Teil 19.
- NLHoe de centrale verwarming te installeren. Part 19.
- RUКак установить центральное отопление. Часть 19.
- PLJak zainstalować centralne ogrzewanie. Część 19.
- JAセントラルヒーティングをインストールする方法。その19。
- ARكيفية تثبيت التدفئة المركزية. الجزء 19.
- HIकैसे केंद्रीय हीटिंग स्थापित करने के लिए। भाग 19।
- IDBagaimana menginstal pemanas sentral. Bagian 19.