HDTutorial
EN

Playback starts YouTube’s embedded player (privacy-enhanced mode).

How to Install Central Heating System. part 2 - lock shields and feed pipe DIY Vlog #11

20,855 views November 13, 2019 14:32

Watch on YouTube
ChannelLCW DIY

Description from the creator

In this part of installing a central heating system we finish hanging the first radiator by lifting the floorboards ready for the underfloor pipework and adding the lock shields and copper pipe feeds.
Be sure to watch the next videos when I run all the 22mm PEX pipe under the floor and connect them up to the radiators 15mm copper pipe.

Do it yourself and save a lot of money.
LCW DIY House Renovation Vlog, continuing the Fleetwood house renovation, DIY style!

Tools and equipment used:-
► Rothenberger Pipeslice - amzn.to/2H3d0nl
► Silverline Pipeslice (cheaper) - amzn.to/2H10Z1G
► Adjustable Wrench Set - amzn.to/2RlEzgk

Music: Epidemic Sound
Take Whatever - Gloria Tells
player.epidemicsound.com/search/?search_query=t…

About this tutorial

LCW DIY published this 14:32 video tutorial on November 13, 2019. It has been watched 20,855 times on YouTube.

Channel
LCW DIY
Duration
14:32
Published
November 13, 2019
Views
20,855
Likes
146

Tags

Share

This tutorial in other languages