Playback starts YouTube’s embedded player (privacy-enhanced mode).
How to build with Interlocking Bricks (CSEB) - Nepali Language
ChannelBuild up NepalDescription from the creator
This video shows the basic steps how to build with Interlocking Bricks for earthquake resistance.
During construction, always follow government approved drawings and construction guidelines!
buildupnepal.com/
Interlocking Bricks: 25% less cost - Earthquake resistant - No plaster
Cost-comparison - 2 room house in Nepal:
Interlocking Bricks: 1600-2200 rs per sq ft
Fired Bricks: 2300-2700 rs per sq ft
Construction rules Interlocking Bricks – Single story, load bearing wall design
1. Location of house:
- Minimum 5 ft from a wall or edge
- Avoid building on loose soil, nearby landslide prone areas, cracks & river banks
2. Foundation
- Minimum 3 ft deep and 3 ft wide (or as per approved drawing)
- Use flat stones (No round stones)
- Use CEMENT sand mortar (No mud mortar)
- DPC band minimum 100 mm thick and 350 mm wide
3. Vertical bars & Horizontal bands
- 3 vertical bars placed in each corner, 4 in T-junction and 5 in Plus-junctions (Anchored from foundation with L-bend, 60xD)
- Vertical bars at every door/window opening and 1.2 meter of continuous wall (anchored from DPC)
- Sill, lintel and top band is minimum 100 mm thick
4. Interlocking Brick Wall
- Corners shall be 90 degrees
- 5mm of cement sand mortar between each course of bricks
- Fill all vertical holes with cement sand mortar
- Make sure bricks are level using water level pipe and spirit
- In T and Plus-Junctions use ¾ bricks on alternate layers
* To ensure quality of your house make sure to strictly follow government approved drawings and construction guidelines! This video only covers a few of the key steps in construction. Practical Action, Build up Nepal and UKaid disclaims any liability in connection with use of this checklist.
buildupnepal.com/
During construction, always follow government approved drawings and construction guidelines!
buildupnepal.com/
Interlocking Bricks: 25% less cost - Earthquake resistant - No plaster
Cost-comparison - 2 room house in Nepal:
Interlocking Bricks: 1600-2200 rs per sq ft
Fired Bricks: 2300-2700 rs per sq ft
Construction rules Interlocking Bricks – Single story, load bearing wall design
1. Location of house:
- Minimum 5 ft from a wall or edge
- Avoid building on loose soil, nearby landslide prone areas, cracks & river banks
2. Foundation
- Minimum 3 ft deep and 3 ft wide (or as per approved drawing)
- Use flat stones (No round stones)
- Use CEMENT sand mortar (No mud mortar)
- DPC band minimum 100 mm thick and 350 mm wide
3. Vertical bars & Horizontal bands
- 3 vertical bars placed in each corner, 4 in T-junction and 5 in Plus-junctions (Anchored from foundation with L-bend, 60xD)
- Vertical bars at every door/window opening and 1.2 meter of continuous wall (anchored from DPC)
- Sill, lintel and top band is minimum 100 mm thick
4. Interlocking Brick Wall
- Corners shall be 90 degrees
- 5mm of cement sand mortar between each course of bricks
- Fill all vertical holes with cement sand mortar
- Make sure bricks are level using water level pipe and spirit
- In T and Plus-Junctions use ¾ bricks on alternate layers
* To ensure quality of your house make sure to strictly follow government approved drawings and construction guidelines! This video only covers a few of the key steps in construction. Practical Action, Build up Nepal and UKaid disclaims any liability in connection with use of this checklist.
buildupnepal.com/
About this tutorial
Build up Nepal published this 4:59 video tutorial on November 7, 2019. It has been watched 43,882 times on YouTube.
- Channel
- Build up Nepal
- Category
- People & Blogs
- Duration
- 4:59
- Published
- November 7, 2019
- Views
- 43,882
- Likes
- 514
Tags
Share
This tutorial in other languages
- FRComment construire avec des briques interverrouillage (SCEB) - Langue népalaise
- ES¿Cómo construir con ladrillos entrelazados (CSEB) - Nepali Language
- PTComo construir com bloqueio Bricks (CSEB) - Nepali Língua
- ITCome costruire con incastro Mattoni (CSEB) - Nepalese Lingua
- DENepali Sprache - Wie mit Interlocking Bricks (CSEB) bauen
- NLHoe te bouwen met in elkaar grijpende Bricks (CSEB) - Nepalees Taal
- RUКак построить с замковых кирпичей (CSEB) - непальский язык
- PLJak budować z cegły (blokujące CSEB) - Język nepalski
- JAどのように連動レンガ(CSEB)を構築する - ネパール語
- ARكيفية بناء مع المتشابكة الطوب (CSEB) - النيبالية اللغة
- HIकैसे ईंटें इंटरलाकिंग (CSEB) के साथ निर्माण करने के लिए - नेपाली भाषा
- IDBagaimana membangun dengan Hendak Batu Bata (CSEB) - Nepal Bahasa